Play Area Installation

This project provided logistical challenges as it was constructed within a new build area. Both play areas consist of wooden play equipment and finished with a bark surface. We worked very safely and efficiently with Proludic and other contractors on this site, as health & safety is our main priority whilst also sticking to the allocated timeframes set. We installed a junior play area which was separate to the Childs play area, they offer different play equipment depending on age and ability.

Integrated Play Solutions

The MUGA was finished off with green tarmac as we are an approved contractor for Tarmac Ltd who supplied the material. We covered all aspects of these works from excavations, to installation of play equipment, fencing and surfacing. This project shows our diverse skill sets that compliment each other.

Phase One

Phase One was the first footpath which connects the alley way of Easthampstead Road to the main entrance on Goodchild Road. The Footpath gives the public a quicker route and a better experience in this recreational space. This footpath runs alongside the play area which was also a separate project that we installed.

Phase Two

Phase Two was the construction of the other footpath that connects the main entrance of King Georges to Seaford Road, running alongside Westende Junior School. This pathway had issues with a higher than expected water table which became apparent when the poor weather came. This slight issue was sorted by agreeing with the customer that raising the footpath would be the most cost effective solution, staying within their budget, without sacrificing quality.

Get In Touch

Ready to transform your outdoor space? Contact us today. Whether you have a specific project in mind or need expert advice, our team is here to collaborate with you. Let's bring your vision to life.